
Demolition to handover — for national restaurant chains.
Full fit-outs for Chili's and Cava. Precision luminaire upgrades for Olive Garden. Every project scoped, documented, and delivered under the same accountability standard.




Ground-up build: demolition through final handover.
ACMC managed complete demolition of the existing shell, structural framing, MEP rough-in, finish carpentry, flooring, and fixture installation — delivering a turnkey operating space on schedule.
Retrofit and rebuild for a fast-casual concept.
Existing retail space demolished, reconfigured, and rebuilt to Cava's operational layout — including electrical service, plumbing rough-in, kitchen infrastructure, and front-of-house finishes.
Precision scope — zero disruption to adjacent operations.
Full luminaire changeover across the dining room completed within a defined maintenance window. Fixture-for-fixture replacement, NEC-compliant connections, and verified photometric output before handover.
Same documented process. Every project. Every size.
From day one, the site manager briefs the client on scope, sequence, and milestones. Daily logs are kept, code compliance is verified before each phase closes, and the finished space is inspected before keys are handed over.
ACMC has been executing licensed, documented restaurant builds since 2019. Send us your scope and we will respond with a structured project assessment — no guesswork on your invoice.
